Installing a bridge and some portals

Still roughing in the land forms but some good progress made with the addition of the major bridge feature and some portals.

20210522_204515.jpg

The bridge is being held in place simply by gluing down the track on either side plus being supported by two pieces of painted foam meant to be the footings. The portals were molding into position using the Mold-A-Scene plaster and I’ve used the earth coloring paint as an undercoat. Again, the roughness is obvious here and some will be retained when appropriate to the scene.

20210522_204520.jpg